41: Early Avionics done, Radio Comunications next
44: Radio Communications Done, Power Storage Next
45: Power Storage Done, Primitive Solid Fuel Next
Spaceplane Hanger Done
Kipper Karrior queued

48: Solid Rocket Bosters done, Liquid Fueled Rockets Queued
50: upgrade mission control, Liquid Fueled Rockets Done, Pressure Vessels queued.
53: Pressure vessels done, film photography queued
54 Mission control done, taking

for the rocket program

55 flight photography done
65 Thumper complete and rolled out

Chute failed to deploy. Rocket was not recovered.
The Baro 2 was queued
69 Kipper Karrior finished/first flight
76 Thumper Rabbit Baro 2 Luanch.
Parachutes proved insiginficant for recovery.
Mature Avionics Research Started
Accept Orbit Kerbin Mission
90 Kipper Kairrior 2 Flight
97 Mature Avionics Done, Thumper Upper Construction Started

109 Thumper Upper Launch


Night Probe. Orbit was not achieved.