D41-109

41: Early Avionics done, Radio Comunications next

44: Radio Communications Done, Power Storage Next

45: Power Storage Done, Primitive Solid Fuel Next

Spaceplane Hanger Done

Kipper Karrior queued

48: Solid Rocket Bosters done, Liquid Fueled Rockets Queued

50: upgrade mission control, Liquid Fueled Rockets Done, Pressure Vessels queued.

53: Pressure vessels done, film photography queued

54 Mission control done, taking

for the rocket program

55 flight photography done

65 Thumper complete and rolled out

Chute failed to deploy. Rocket was not recovered.

The Baro 2 was queued

69 Kipper Karrior finished/first flight

76 Thumper Rabbit Baro 2 Luanch.

Parachutes proved insiginficant for recovery.

Mature Avionics Research Started

Accept Orbit Kerbin Mission

90 Kipper Kairrior 2 Flight

97 Mature Avionics Done, Thumper Upper Construction Started

109 Thumper Upper Launch

Night Probe. Orbit was not achieved.