Author: kuriosly

  • Y1 D6

    The Hammertine was rolled out.

    A very successful launched and landed

    About 13 science for that mission

    Due to the parabolic arc that was observed without control, controlled flight is needed.

    Powered Flight Research Started/Finished

    Lost and Found Research Started

    The hammertime 2 is commissioned.

    As part limits were seen during the commisioning of the hammertime 2, a upgrade effort on the VAB was started.

    Lost and Found ended.

    Basic Science Started / Finished

    Specialized Contruction Started.

  • Y1 D5

    Lightweight Fabrics research ended.

    Basic Rocketry research was started.

    Basic Rocketry research was ended.

    General Construction research was started

    the Hammertine started construction

    General Construction finished research

    The Contract Escape the Atmosphere was accepted.

  • Y1 D4

    Launch pad update finished to Launch pad 2, Roll out of Oke Doke

    which promptly exploded shortly after takeoff. But science was obtained!

    Research into parachutes (Lightweight Fabrics) was started.

  • Y1 D2 :

    The following tasks were accepted:

    Launch First Vessel
    Gather Scientific Data

    The rocket launch pad upgrade 1 was finished
    The Second Launch pad upgrade was started.

  • Y1 D1

    Launch pad upgrade is started , expected to finish in 2 days to increase max rocket size to 13x17m

    Additionally the Oke Doke was put under construction.


    A small initial sounding rocket, it possesses a payload of a battery and avionics unit.