Category: The Side Project

  • D231 to D296

    231


    Docking is the new contract

    I also am starting to get to the point where I can pack enough dV on a rocket to push a probe out to Jool. So considering the primary mission here soon

    Also being taken. Was planning on it anyways

    Which means Surface Probes as soon as science opens up

    232: new conract

    We’ll send a goo container up on an old Thumper Upper Max

    233 Surface probes research started

    Landing Rocket Designed:

    New Flight Contract

    I’m missing the science mission for propecore…

    Taking a new contract… there are no contracts, going to stockpile the rocket for now

    253 Moon Touchdown

    200 science gained from that mission

    Magmeto Research Started

    256:
    The Klatlas Pod:

    And the Waiting Maiden

    These are the docking testing craft.

    266 The Waiting Maiden Launches

    276 The Katlas Probe Launches

    277 Docking

  • D173 to D230

    D173
    Accepted

    will build 1 tiny orbiters for it. These will be one way trips using a modified upper thumper max sat, to met up with pre-existing satalite After rendezous we will send them out to somewhere to do science! (these are expensive probes.)

    Upper stage

    D174 Flight Contract w/ Kipper Karrior, all went well

    Early Liquid Filled Engine R&D Started

    The Kessna KaiCourier

    Day 176
    Contract satalite launch

    181 Early Vaccuum Optimization started

    (Working to a manned spacewalk)

    183 Thumper Upper Max NRI rollout

    Picking up this contract for the NRI mission

    The NRI mission is a return probe

    184 Probe has battery issues as main solar panels were destroyed during liftoff.

    Mission is a failure as probe is inop

    Crewed Capsule Research started

    New Mission Package

    194 Satalite Renduvous mission attempt (no aids really)

    D195 Rendezvous success

    High Performance Parachute Queued

    Kerbin First now demands a spacewalk

    Using a modified Thumper Upper, as it does not need to leave KLO

    D199 – Mun orbit achieved

    202 Starting Biologoical Research

    203 Jeb’s first spaceflight!

    Jeb reentered the earth at orbital speeds. Jeb has yet to be found.

    Next “key” mission is orbital crew transfer This requires space backpacks or docking. (80 for multi-crew vehicles, 60 for extra-vehular activities)

    214 Stolou Lifter rolled out

    Multi-crew started

    launch abort,roll back to put new engine on.

    215 Stolou Lifter rolled out again

    226 Fuel Cells R&D

    227 Large Scale Construction

    229 Large Tanks

    230 Two manned rockets finished, Time to move people in space

    (Jeb has mysteriously been found)

    One up

    Two

    Crew Transfer

    And Return

  • D110 to D172

    D110

    New Contract to pay for upgrades to the tracking station

    They are all on top of the launchsite, so this is a rover mission.

    Research into Primitive Liquid Rockets started.

    the Vroom

    116 – Primitive Vaccuum Engine Research

    117 Vroom rolled out. It rolled. Will try again later.

    121 – Early Monopropellant Research started

    127 Thumper Upper 2 Build and rolled out

    Redo

    128

    Welp it went from orbit to intersteller object…

    Starting research on reaction control systems

    Next mission is an orbit itself

    Accidental Isntersteller Object Confirmed

    Day 139 First attempt at Orbit and Return (with a camera)

    Successful retrieval of photos.

    Started Solar Panel Research

    Accepted a Mun flyby contract, the max can in theory make that trip anyways. Will change out payload for a science probe. Upgrading VAB to handle greater part load.

    Massive amounts of base upgrade to get flight planning unlocked.

    Space Research Research started.

    Accepted:

    using a modified Thumper Upper Max Sat Edition for it.

    153 Finished Vrroom series local exploration missions.

    On to a new plane contract!

    154 Airframe construction r&D started

    157 Developed Propeller R&D started

    158 Heat Management R&D Queued.

    162 Orbital Radio started R&D

    163 Thumper Upper Max NR Launched to Mun for flyby and return

    Thumper Upper Max NRI queued for Radiation Orbitial Research

    View from far away.
    We don’t have patched conics, so doing manual fightpaths. This is gonnna suck.

    168 Mun flyby

    Ablative Materials Science Started

    172 Percision Components Started

    Reentry after 11 days

  • D41-109

    41: Early Avionics done, Radio Comunications next

    44: Radio Communications Done, Power Storage Next

    45: Power Storage Done, Primitive Solid Fuel Next

    Spaceplane Hanger Done

    Kipper Karrior queued

    48: Solid Rocket Bosters done, Liquid Fueled Rockets Queued

    50: upgrade mission control, Liquid Fueled Rockets Done, Pressure Vessels queued.

    53: Pressure vessels done, film photography queued

    54 Mission control done, taking

    for the rocket program

    55 flight photography done

    65 Thumper complete and rolled out

    Chute failed to deploy. Rocket was not recovered.

    The Baro 2 was queued

    69 Kipper Karrior finished/first flight

    76 Thumper Rabbit Baro 2 Luanch.

    Parachutes proved insiginficant for recovery.

    Mature Avionics Research Started

    Accept Orbit Kerbin Mission

    90 Kipper Kairrior 2 Flight

    97 Mature Avionics Done, Thumper Upper Construction Started

    109 Thumper Upper Launch

    Night Probe. Orbit was not achieved.

  • Note about dates (they were wrong)

    Dates are in Earth time, should have been in kerbal time. I’ll have to go back and redate some things.

  • Y1 D10

    Double Hammer Finished and rolled out

    First rocket to space contract

    Peaked at 258k from orbit, the rocket overperformed. Luckly it did not burn up on reentry.



    Radio connection was intermittent, with intermittent control of rocket.

    First return of science and first to leave Kebin atmosphere contracts completed.

    Taking on the following contracts:

    Thats, right, we are going plane mode for a little bit to make some money.

    Proposed flightpath isn’t complicated.

    Early Avionics Research Started. (We need reaction wheels or some secondary steering for orbital insertion)

    Aircraft blueprint:

    The Kipper Karrior

    Upgrade to Spaceplane Hanger needed.

  • Y1 D8

    Hammertine 2 Completed and Rolled out

    Note: there is no SAS. It’s hand-flying

    It was unpofitable / uneventful. Nothing gained.

    Scientific Instruments Research Started.

    Research and Development Upgrade queued.

    The Double Hammer plans:

    Science Added to payload bay

    Scientific Instruments Research Finished.

  • Y1 D6

    The Hammertine was rolled out.

    A very successful launched and landed

    About 13 science for that mission

    Due to the parabolic arc that was observed without control, controlled flight is needed.

    Powered Flight Research Started/Finished

    Lost and Found Research Started

    The hammertime 2 is commissioned.

    As part limits were seen during the commisioning of the hammertime 2, a upgrade effort on the VAB was started.

    Lost and Found ended.

    Basic Science Started / Finished

    Specialized Contruction Started.

  • Y1 D5

    Lightweight Fabrics research ended.

    Basic Rocketry research was started.

    Basic Rocketry research was ended.

    General Construction research was started

    the Hammertine started construction

    General Construction finished research

    The Contract Escape the Atmosphere was accepted.

  • Y1 D4

    Launch pad update finished to Launch pad 2, Roll out of Oke Doke

    which promptly exploded shortly after takeoff. But science was obtained!

    Research into parachutes (Lightweight Fabrics) was started.