D173 to D230

D173
Accepted

will build 1 tiny orbiters for it. These will be one way trips using a modified upper thumper max sat, to met up with pre-existing satalite After rendezous we will send them out to somewhere to do science! (these are expensive probes.)

Upper stage

D174 Flight Contract w/ Kipper Karrior, all went well

Early Liquid Filled Engine R&D Started

The Kessna KaiCourier

Day 176
Contract satalite launch

181 Early Vaccuum Optimization started

(Working to a manned spacewalk)

183 Thumper Upper Max NRI rollout

Picking up this contract for the NRI mission

The NRI mission is a return probe

184 Probe has battery issues as main solar panels were destroyed during liftoff.

Mission is a failure as probe is inop

Crewed Capsule Research started

New Mission Package

194 Satalite Renduvous mission attempt (no aids really)

D195 Rendezvous success

High Performance Parachute Queued

Kerbin First now demands a spacewalk

Using a modified Thumper Upper, as it does not need to leave KLO

D199 – Mun orbit achieved

202 Starting Biologoical Research

203 Jeb’s first spaceflight!

Jeb reentered the earth at orbital speeds. Jeb has yet to be found.

Next “key” mission is orbital crew transfer This requires space backpacks or docking. (80 for multi-crew vehicles, 60 for extra-vehular activities)

214 Stolou Lifter rolled out

Multi-crew started

launch abort,roll back to put new engine on.

215 Stolou Lifter rolled out again

226 Fuel Cells R&D

227 Large Scale Construction

229 Large Tanks

230 Two manned rockets finished, Time to move people in space

(Jeb has mysteriously been found)

One up

Two

Crew Transfer

And Return

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *