Y1 D6

The Hammertine was rolled out.

A very successful launched and landed

About 13 science for that mission

Due to the parabolic arc that was observed without control, controlled flight is needed.

Powered Flight Research Started/Finished

Lost and Found Research Started

The hammertime 2 is commissioned.

As part limits were seen during the commisioning of the hammertime 2, a upgrade effort on the VAB was started.

Lost and Found ended.

Basic Science Started / Finished

Specialized Contruction Started.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *